West Yost provided construction management/inspection under an accelerated construction schedule for this 156 cfs stormwater pump station, which included trench style concrete wetwell, mechanical “flexrake” trash rack, four propeller duty pumps with low speed motors, and one low flow pump. Construction was completed 10 weeks after breaking ground to provided the interim stormwater pumping facilities needed to accept stormwater.

The project also included standby power (an 800 kW generator), automatic transfer switch, concrete fuel tank, and a load bank. The project included a masonry support building with electric room and maintenance room. The discharge pipes were constructed through a Division of Dam Safety regulated levee. Site work including access roads, grading, site paving, precast concrete soundwalls, lights, fencing, water lines, and site drainage. 