Construction Management

Overview

Construction Management
Stormwater

Project

Construction Management for Valley Glen Stormwater Pump Station
City of Dixon, California

West Yost provided construction management/inspection under an accelerated construction schedule for this 156 cfs stormwater pump station, which included trench style concrete wetwell, mechanical “flexrake” trash rack, four propeller duty pumps with low speed motors, and one low flow pump. Construction was completed 10 weeks after breaking ground to provided the interim stormwater pumping facilities needed to accept stormwater.

Project

Dry Creek Levee Relocation
City of Roseville, California

West Yost provided planning, analysis, environmental review, permitting, design, and construction management services for the Dry Creek Wastewater Treatment Plant Pond Levee Relocation. This project included the hydrologic and hydraulic evaluations of setting the pond levees 100 feet back from the Dry Creek bank in order to provide 100-year protection of the wastewater storage ponds while enhancing the flow-carrying capacity of Dry Creek in an environmentally sensitive manner.

Commands