West Yost provided planning, design, and construction management
services for the Linne Road Reservoir and Pump Station project.
The project consists of construction of a 7.2 MG, buried,
prestressed concrete reservoir, a 21 mgd booster pump station,
and installation of approximately two miles of 24 inch
transmission main.
The facilities are located within a park site adjacent to a
baseball field.The tank is buried and covered with tennis
courts. West Yost’s services included preparation of a
feasibility report that evaluated alternative site
configurations, hydraulic modeling, design, and services during
construction.
West Yost provided design and construction management
services to expand the existing 14-Mile Slough Pump Station
(14-MSPS) by nearly 700%. This project represents one of the
largest trench-style wetwell pump stations in California. The
award-winning pump station upgrade increased reliable pumping
capacity from 3.75 mgd to 14 mgd, and with a buildout capacity of
22.5 mgd.
West Yost assisted the City with a design-build for a $14 million
project to extend sewer lines to an undeveloped area in northeast
Stockton. West Yost served as the City’s representative to
complete 30 percent design, right of way acquisition, design
build team procurement, and construction management
services. Construction management services included all
contract administration, full-time onsite construction
monitoring, and all closeout activities.