West Yost provided construction management/inspection under an
accelerated construction schedule for this 156 cfs storm water
pump station, which included trench style concrete wetwell,
mechanical “flexrake” trash rack, four propeller duty pumps with
low speed motors, and one low flow pump. Construction was
completed 10 weeks after breaking ground to provided the interim
stormwater pumping facilities needed to accept storm water.
West Yost provided planning, analysis, environmental review,
permitting, design, and construction management services for the
Dry Creek WWTP Levee Relocation. This project included the
hydrologic and hydraulic analyses of Dry Creek in the vicinity of
the WWTP. The project provides 100 year protection of the
wastewater storage ponds while enhancing the flow carrying
capacity of Dry Creek in an environmentally sensitive manner.